City of Edmonton - Managed Detection and Response Deployment
Project Manager (2020)
Project manager assisting the implementation of a managed detection and response product suite.

City of Edmonton - Various Transit Projects
Technical consultation and architectural Review (2019-2020)
Provided technical consultation and technical review of various transit projects include OT and IT systems

City of Edmonton - Primary & Secondary Data Center Move
Data Center Architect & System Migration Specialist (2018 – 2019)
Assisted the City with relocation of their primary and secondary data centers. The City was in two must move situations which created tight project timelines. Created the migration plan and moved both data centers over 18 months with no downtime. Delivered both projects on-time and under budget

ATB - CIDC Architectural Symmetry Data Center Build
Data Center Architect & System Migration Specialist (2016 – 2017)
Assisted ATB with upgrade their production Data Centre to match the same architectural standards as their relocated data center.

ATB - CIDC Consolidation data center project Migration
Data Center Architect & System Migration Specialist (2016 – 2017)
Assisted ATB with designing and implementing new row design to support “High Density” requirements. Over six months, all rows were consolidated into a single row, without service interruption.

ATB - Data center relocation project
Project Manager (2014 – 2015)
ATB Financial was in a must move situation. The equipment in the Data Centre was end of life, or close to it. The approach to “move” included re-platforming all the infrastructure onto the latest technologies available. Reported to the Data Centre Relocation Program (DCRP) Program Manager in support of, the following work streams: Network, Security, Complex Workloads and Facilities.

Operation Iraqi Freedom and Enduring Freedom
KBR – IT Communications Country Manager Iraq (2005 -2007)
- Liaison between Kuwait/Iraq and US military Leadership
- Directly supported the U.S. Military Operations during Operation Iraqi Freedom and Enduring Freedom
- Delivered mission-critical communications and infrastructure to the U.S. Military and 24K contracted employees
- Retained 98.24% network availability with no time lost due to incidents or injury under extreme conditions
- Theatre Transportation Mission (TTM) supply chain/communications management in the way of RFID, QUALCOMM Satellites, Radio communications on 1800 tractor trailer trucks throughout Kuwait & Iraq
- Directed a 45-60-member staff supporting 15 military bases for the Department of Defense in Kuwait and Iraq